CC · morning brief 2026-10-31 · open

CC: FBA capacity limit blocks 004-FBA swap (Susie) 2026-10-09

What to do
FBA capacity limit blocks 004-FBA swap 2026-10-09.
Why
Chile Crunch inbound shipment blocked. Context: 2026-10-09 Brian told Susie to swap a product -> 004-FBA in Send to Amazon. She replied 14:01 MT: "This product exceeds the current FBA capacity limit" when adding 004-FBA. To do: in Seller Central check FBA capacity limits / IPI for the 3-pack product, find whether units can be reduced or limit raised; then prepare an unsent draft reply to Susie with the exact units she can send. Do not send. After she completes the swap, delete a product. Done when: draft reply exists and Orig-2-FBA deleted. No machine close check. No money figure is on file for it. It is 19 day(s) past its ClickUp due date.
If you approve
I carry it out with the usual safety checks and post the proof on the ClickUp task.
If you deny
Nothing is done. The task is closed with your reason and it will not come back in the brief.
Where it is tracked
the ClickUp task
How it ends
Ends when the ClickUp task is closed.

The detail

Original wording: CC: FBA capacity limit blocks 004-FBA swap (Susie) 2026-10-09.

Chile Crunch (CC, LMS) inbound shipment blocked. Context: 2026-10-09 Brian told Susie (susie@chilecrunch.com) to swap SKU Orig-2-FBA -> 004-FBA (170 units, exp 08/09/2029, label X001O8FYSB) in Send to Amazon. She replied 14:01 MT: "This product exceeds the current FBA capacity limit" when adding 004-FBA. To do: in Seller Central (CC account) check FBA capacity limits / IPI for the 3-pack product (X001O8FYSB), find whether units can be reduced or limit raised; then prepare an UNSENT draft reply to Susie (first person singular, no choices offered) with the exact units she can send. Do not send. After she completes the swap, delete SKU Orig-2-FBA (no stock). Done when: draft reply exists + Orig-2-FBA deleted. No machine close check — declared at filing time: client reply + SKU delete are manual

ApproveDenyMore info

Back to the brief