From this morning's brief (2026-10-31)

Open the whole brief

← all clients

BPS

BioPharma Scientific live scale-up rebuilt Sat, Oct 31, 1:20 PM

Shared growth plan — 2026-09-28 through 2026-10-27. reported revenue $39,717.14; reported net $12,564.13.

PROVISIONAL — reported net is not a verified contribution margin; reconcile itemized costs and refunds. The reconciliation difference is $3,615.50.

BioPharma Scientific: 2 execution result(s) recorded in the last 7 days; 22 overdue action(s). Financial or evidence gaps remain. See Growth plan for current actions and evidence. The separate Numbers tab is an earlier planning snapshot; it does not establish that today's profit target is met or authorize increased spending.

The machine5 of 10 things we run for them are overdue or have never run
Changes madenothing has been changed on their account in this run
Work delivered4 things produced in the last 30 days
Results measurednothing scored yet - the first one finishes its waiting period on Nov 3
Waiting on you15 things cannot move until you decide or hand something over

Growth plan

Through September 30, execute the BioPharma NTB sprint: measurement/targeting cleanup, product-text and claim readiness, verified economics and inventory, one gated current-price acquisition test, daily audits and Cockpit updates. Images are on operator hold; preserve existing contribution, reformulation and compliance commitments.

30-day, 60-day and quarterly scorecard

Plan as of 2026-09-17. Baseline: August · COULD-NOT-VERIFY — baseline source missing or changed.

Reported revenue 39252.149999999994; reported net 10794.65. Reported net is not certified contribution. Source window, fees, cost coverage and client-specific adjustments must reconcile before financial scoring. This snapshot does not refresh the underlying data. Evidence review 2026-09-13: August US reported revenue $38927.4, net $9765.16. Current August reported revenue $38,927.40 / 615 units differs from the reference $39,252.15 / 620; all-marketplace recheck matches the US result. Reconcile the source restatement before financial scoring; preserve relaunch dependencies. Evidence: Sync/client-growth/scorecards/financial-evidence-20260913/BPS-observation.json. August settlement review starts September 15; original baseline values remain unchanged.

Baseline source and limits

mode7-analysis/mode6k-actuals/BPS_actuals.json

["SESSIONS CORRECTED: the P&L reported 1,375 sessions for 2026-08-01..2026-08-31; Amazon's own Business Report says 1,462 (+6.3%). Amazon's figure is used. Any CVR quoted from the old number was wrong by the inverse of this."]

Horizon / deadlineMeasurable targetOwner / existing actionsResults / evidence
30 days
2026-09-17 → 2026-09-30
Review: 2026-09-30
September 17–30 NTB daily coverage: one setup/source review on September 17 plus 13 dated work/audit/Cockpit records on September 18–30. Five production checkpoints are scored separately below.

Delivery target: 14 dated records: 1 setup review + 13 daily work/audit updates (dated_ntb_audit_and_cockpit_update_records)

Brian / client-growth + mode6k + mode7-audit
BPS-NTB-AUDIT-20260917, BPS-NTB-AUDIT-20260918, BPS-NTB-AUDIT-20260919, BPS-NTB-AUDIT-20260920, BPS-NTB-AUDIT-20260921, BPS-NTB-AUDIT-20260922, BPS-NTB-AUDIT-20260923, BPS-NTB-AUDIT-20260924, BPS-NTB-AUDIT-20260925, BPS-NTB-AUDIT-20260926, BPS-NTB-AUDIT-20260927, BPS-NTB-AUDIT-20260928, BPS-NTB-AUDIT-20260929, BPS-NTB-AUDIT-20260930
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260917: completed · Preparation / research

Setup and source audit complete; live account checks and independent audit remain open.

No usable completion evidence

BPS-NTB-AUDIT-20260918: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

BPS-NTB-AUDIT-20260919: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

BPS-NTB-AUDIT-20260920: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

BPS-NTB-AUDIT-20260921: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

BPS-NTB-AUDIT-20260922: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

BPS-NTB-AUDIT-20260923: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260924: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260925: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260926: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260927: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260928: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260929: scheduled · Preparation / research

No result recorded

No usable completion evidence

BPS-NTB-AUDIT-20260930: scheduled · Preparation / research

No result recorded

No usable completion evidence

Evidence required14 dated records, with September 17 explicitly setup-only. Each later record includes actual work, fresh/unknown source state, changes made or none, next action and Cockpit update. Missing days are misses. This metric measures reporting delivery only, not independent audit PASS, launch, NTB volume or profit.
30 days
2026-09-17 → 2026-09-18
Review: 2026-09-18
Measurement and campaign repair package

Delivery target: 1 verified checkpoint deliverable (measurement_and_repair_package)

Ads + Mode6K
BPS-NTB-AUDIT-20260918
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260918: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

Evidence requiredOne current campaign/target classification and repair package, expired-test disposition, attribution windows and named Mode7 executor. Proposed changes are not live changes.
30 days
2026-09-17 → 2026-09-21
Review: 2026-09-21
Three-product written acquisition-readiness package; images held by operator

Delivery target: 1 verified checkpoint deliverable (three_product_text_claims_targeting_package)

Creative + catalog
BPS-NTB-AUDIT-20260921
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260921: blocked · Preparation / research

Stopped run reconciled; unfinished action is eligible for safe resume

No usable completion evidence

Evidence requiredThree written evidence-linked product/claims/targeting briefs for Green Apple, NanoReds and NanOmega, with supported proposed text corrections and unresolved inputs explicitly assigned. No image generation/edit/upload/publication. An unresolved visual prerequisite remains a launch hold and is not counted as resolved.
30 days
2026-09-17 → 2026-09-24
Review: 2026-09-24
One-product / one-source launch-or-hold decision

Delivery target: 1 verified checkpoint deliverable (evidenced_launch_or_hold_decision)

Brian + Mode6K / Mode7
BPS-NTB-AUDIT-20260924
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260924: scheduled · Preparation / research

No result recorded

No usable completion evidence

Evidence requiredOne written decision with evidence for each launch gate, proposed approved-limit basis, stop/rollback/monitoring plan, and exact next owner. HOLD may satisfy a truthful decision record but does not satisfy launch or financial delivery. Live launch is separately verified on the owning action.
30 days
2026-09-17 → 2026-09-28
Review: 2026-09-28
Stock and formula readiness readout

Delivery target: 1 verified checkpoint deliverable (stock_and_formula_readiness_readout)

Inventory + catalog
BPS-NTB-AUDIT-20260928
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260928: scheduled · Preparation / research

No result recorded

No usable completion evidence

Evidence requiredOne dated per-ASIN stock/reserve/formula readout with confirmed availability or explicit hold, covering the selected test and reformulation commitments. ETA alone cannot satisfy FBA availability.
30 days
2026-09-17 → 2026-09-30
Review: 2026-09-30
September closeout and October handoff

Delivery target: 1 verified checkpoint deliverable (september_ntb_closeout)

Brian + client-growth
BPS-NTB-AUDIT-20260930
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-NTB-AUDIT-20260930: scheduled · Preparation / research

No result recorded

No usable completion evidence

Evidence requiredOne source-linked September closeout assessing all checkpoint outcomes and daily coverage; actual changes, mature/immature cohorts, spend, NTB and verified/unknown contribution; exact October dates and owners. No financial lift is inferred from completed records.
30 days
2026-09-09 → 2026-10-08
Review: 2026-10-09
Validate August margins, relaunch the three NanoGreens formulas only when new stock is FBA-available, and track NanoGluco compliance to its existing October 11 deadline.

Delivery target: 1 source-backed delivery (validated_baseline_and_selected_intervention_package)

mode6k + client-growth
BPS-ECONOMICS, BPS-RISK, BPS-DIAGNOSIS, BPS-EXPERIMENT, BPS-REFORMULATION-RELAUNCH, BPS-NSF-GMP-NANOGLUCO
OVERDUE — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-ECONOMICS: blocked · Preparation / research

Fresh August sources and cost coverage checked. Sellerboard and Amazon sales totals match. Configured-cost match covers 615/615 August ordered units. Historical-date/marketplace-qualified coverage is 0/615; recover missing source metadata and cost gaps before certifying historical CM. Do not treat omitted export dates as missing or zero configured costs. Existing targets and baseline remain provisional; no measured financial result qualified for linkage.

No usable completion evidence

BPS-RISK: in_progress · Preparation / research

Client 2026-09-11: NanoGreens NG26132 exp 05/2028 + NanoReds NR26188 exp 07/2028 confirmed not expired; NSF GMP order 00002798 submitted for NanoGluco (~30d); 3 reformulated NanoGreens SKUs on client no-ship hold until new stock (09-28 / early Oct), same UPC, flip on FBA-live day.

No usable completion evidence

BPS-DIAGNOSIS: in_progress · Preparation / research

Scoped B0FST44W79 PPC/SEO repair under explicit Sep9 user authorization: six enabled exact keywords, approved-budget cap, merchant copy/backend verified, A+ revisions published in manager. Price unchanged. Public propagation, PT04 ingestion, hotspot renderer and H10 rank checks remain open. This does not complete the whole-client diagnosis.

No usable completion evidence

BPS-EXPERIMENT: open · Preparation / research

No result recorded

No usable completion evidence

BPS-REFORMULATION-RELAUNCH: open · Account intervention

Created 2026-09-11 from Jen Linnett Slack decisions.

No usable completion evidence

BPS-NSF-GMP-NANOGLUCO: in_progress · Preparation / research

NSF TRF TR178742658027451 per memory; Order 00002798.

No usable completion evidence

Evidence requiredOne client-specific package: dated cost/fee/traffic bridge with unknowns; verified stock/offer constraints; one Mode6K-selected lever, own-unit success measure, owner and due date. Record the actual implementation evidence separately. A blocked prerequisite is a miss/hold, not a successful intervention.
60 days
2026-09-09 → 2026-11-07
Review: 2026-11-09
Recover the sourced monthly contribution milestone using the live reformulated catalog and one measurable demand driver.

Delivery target: 1 source-backed delivery (matched_window_intervention_assessment)

Financial working target: 13632.86 USD contribution per month. EXISTING KPI WORKING TARGET — validate current basis. Maintain or recover the existing milestone; no new growth percentage or spending allowance is assumed.

mode6k + client-growth
BPS-ECONOMICS, BPS-DIAGNOSIS, BPS-EXPERIMENT, BPS-WEEKLY
OPEN — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-ECONOMICS: blocked · Preparation / research

Fresh August sources and cost coverage checked. Sellerboard and Amazon sales totals match. Configured-cost match covers 615/615 August ordered units. Historical-date/marketplace-qualified coverage is 0/615; recover missing source metadata and cost gaps before certifying historical CM. Do not treat omitted export dates as missing or zero configured costs. Existing targets and baseline remain provisional; no measured financial result qualified for linkage.

No usable completion evidence

BPS-DIAGNOSIS: in_progress · Preparation / research

Scoped B0FST44W79 PPC/SEO repair under explicit Sep9 user authorization: six enabled exact keywords, approved-budget cap, merchant copy/backend verified, A+ revisions published in manager. Price unchanged. Public propagation, PT04 ingestion, hotspot renderer and H10 rank checks remain open. This does not complete the whole-client diagnosis.

No usable completion evidence

BPS-EXPERIMENT: open · Preparation / research

No result recorded

No usable completion evidence

BPS-WEEKLY: open · Preparation / research

No result recorded

No usable completion evidence

Evidence requiredOne assessment links the chosen lever to baseline and follow-up windows, live implementation proof and the appropriate client profit/royalty measure. Record achieved, missed or inconclusive with source evidence. A planning document or low sample is not proof of lift.
Quarterly
2026-10-01 → 2026-12-31
Review: 2027-01-15
Maintain profitable demand on the eligible catalog; measure reformulation performance separately from TikTok and unresolved compliance holds.

Delivery target: 1 source-backed delivery (settled_quarter_outcome_and_next_quarter_plan)

Financial working target: 13632.86 USD contribution per month. EXISTING KPI WORKING TARGET — validate current basis. Maintain or recover the existing milestone; no new growth percentage or spending allowance is assumed.

mode6k + horizon-review
BPS-WEEKLY, BPS-EXPERIMENT, BPS-REFORMULATION-RELAUNCH, BPS-NSF-GMP-NANOGLUCO
OPEN — outcome not assessed

UNMEASURED — experiment measurement is separate from milestone delivery

BPS-WEEKLY: open · Preparation / research

No result recorded

No usable completion evidence

BPS-EXPERIMENT: open · Preparation / research

No result recorded

No usable completion evidence

BPS-REFORMULATION-RELAUNCH: open · Account intervention

Created 2026-09-11 from Jen Linnett Slack decisions.

No usable completion evidence

BPS-NSF-GMP-NANOGLUCO: in_progress · Preparation / research

NSF TRF TR178742658027451 per memory; Order 00002798.

No usable completion evidence

Evidence requiredOne Q4 assessment after settlement compares October–December actuals to the validated goal, separates recurring contribution from recoveries, records held/missed milestones, and assigns Q1 actions and inventory needs. Monthly reference targets are not multiplied into an invented quarter forecast.

Inputs and delivery deadlines

External due dates are agency follow-up/review deadlines, not promises made by the client.

BPS-INPUT-20260913 · overdue · due 2026-09-16

Confirm per-ASIN new-formula FBA availability and source the NanoGluco NSF/GMP disposition. Existing relaunch due September 28 and compliance due October 11 remain controlling.

Owner: inventory-replenish + amazon-compliance + mode6k. Agency coordinator: client-growth. Action: BPS-REFORMULATION-RELAUNCH.

The named owner checks existing source records and linked work first, resolves supported internal gaps, and records the exact remaining input and next review on BPS-REFORMULATION-RELAUNCH. No duplicate client message or inferred approval.

Close only when: The named owner supplies dated own-client evidence, explains remaining discrepancies and updates the existing canonical source or explicitly retains the unresolved gate.

BPS-NTB-AUDIT-20260918-INPUT · overdue · due 2026-09-18

September 18: Reconcile campaign classification and expired discovery authorization; prepare exact target repairs. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260918.

BPS only, September 18, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Reconcile campaign classification and expired discovery authorization; prepare exact target repairs. A dated campaign/target matrix separates brand defense, own-ASIN cross-sell, generic and external acquisition. Verify failed Display campaign state. Prepare specific scientific PHRASE and mineral supplements BROAD corrections with Mode7; preserve useful brand terms. Read current results/state of the September 14 discovery test; no expired authorization is extended. Recheck Brand Tailored Promotion audience eligibility read-only. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260918. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-MEASUREMENT-20260918 using metric measurement_and_repair_package; record achieved only when its full acceptance condition is met: One current campaign/target classification and repair package, expired-test disposition, attribution windows and named Mode7 executor. Proposed changes are not live changes. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260919-INPUT · overdue · due 2026-09-19

September 19: NTB work, audit and Cockpit update — Reconcile Green Apple product text, claims and current-format evidence. and the dated daily audit/update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260919.

BPS only, September 19, 2026. Reconcile Green Apple product text, claims and current-format evidence. Check current label, ingredients, serving/directions and claim substantiation. Inventory existing assets read-only to identify launch prerequisites. Resolve the liquid-volume conflict in the written brief without inventing an amount. Record any visual issue as held; do not create, edit, upload or publish images. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260920-INPUT · resolved · due 2026-09-20

September 20: NTB work, audit and Cockpit update — Resolve NanoReds sugar/category conflicts and prepare a text-only correction brief. and the dated daily audit/update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260920.

BPS only, September 20, 2026. Resolve NanoReds sugar/category conflicts and prepare a text-only correction brief. Verify No Sugar Added versus added sugar and Weight Loss classification using current authoritative product evidence. Prepare exact supported textual corrections and source references for the existing catalog owner. No image or A+ visual changes. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260921-INPUT · overdue · due 2026-09-21

September 21: NTB work, audit and Cockpit update — Finish NanOmega product-text and targeting readiness; review all three written briefs. and the dated daily audit/update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260921.

BPS only, September 21, 2026. Finish NanOmega product-text and targeting readiness; review all three written briefs. Clarify powder format, use and approved label amounts in the written brief, distinguishing 1,000 mg linolenic acid from 100 mg DHA. Deliver three evidence-linked product-text/claim/targeting briefs. Video script recommendations may be written as text only; no image or video asset generation, editing or upload. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260922-INPUT · overdue · due 2026-09-22

September 22: Validate current per-product economics and acquisition stock allowance. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260922.

BPS only, September 22, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Validate current per-product economics and acquisition stock allowance. Reconcile current price, existing discounts/subscriptions, fees, refunds and costs. Compute contribution before acquisition and a supported loss/spend limit; no price edits. Record current sellable units, baseline demand, 30-day reserve, expected inbound and maximum incremental allowance. Historical blended CAC and $29.32 are not usable overrides. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260922. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260923-INPUT · overdue · due 2026-09-23

September 23: Prepare one executable test specification and measurement sheet. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260923.

BPS only, September 23, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Prepare one executable test specification and measurement sheet. Select one candidate product and one acquisition source using verified product readiness, demand and economics. Specify current fixed offer, one variable, exact campaign/targets, finite total cap, CPC basis, maximum incremental units, attribution windows, monitoring owner, hard-stop conditions and rollback. Select a lane with reportable NTB metrics if NTB is the measured outcome; label SP results as proxies. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260923. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260924-INPUT · overdue · due 2026-09-24

September 24: Record GO or HOLD; route an eligible test through the existing account owner. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260924.

BPS only, September 24, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Record GO or HOLD; route an eligible test through the existing account owner. All launch gates require dated evidence. GO requires current stock and economics, product/claims approval, released applicable growth hold, a selected canonical action, verified monitoring and finite spending authority. Execute only through the existing Mode7 owner and shared lock; this local action stages the handoff. If any gate fails, record HOLD, exact missing evidence, owner and next review. Do not mark a test launched until the owning action has live after-state evidence. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260924. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-DECISION-20260924 using metric evidenced_launch_or_hold_decision; record achieved only when its full acceptance condition is met: One written decision with evidence for each launch gate, proposed approved-limit basis, stop/rollback/monitoring plan, and exact next owner. HOLD may satisfy a truthful decision record but does not satisfy launch or financial delivery. Live launch is separately verified on the owning action. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260925-INPUT · overdue · due 2026-09-25

September 25: Audit the selected lane or held decision; check audience eligibility. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260925.

BPS only, September 25, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Audit the selected lane or held decision; check audience eligibility. Read actual changes from owner receipts and compare spend/stock against the approved cap. If no test launched, report that explicitly and advance the named readiness work. Recheck Brand Tailored Promotion eligibility read-only. Record attribution maturity and source-specific results; no coupon or deal activation. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260925. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260926-INPUT · overdue · due 2026-09-26

September 26: Review query relevance, CPC and losses using mature evidence. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260926.

BPS only, September 26, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Review query relevance, CPC and losses using mature evidence. Apply the approved test decision rules only through the existing owner. Separate early diagnostics from matured conversion evidence. Review around one approved target CAC without an order and normally stop around two only after the relevant lag and using the written experiment rule; no automatic reuse of the report examples. Enforce absolute spend/stock limits even while attribution is immature. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260926. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260927-INPUT · overdue · due 2026-09-27

September 27: NTB work, audit and Cockpit update — Audit execution evidence, missing daily updates and remaining non-image blockers. and the dated daily audit/update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260927.

BPS only, September 27, 2026. Audit execution evidence, missing daily updates and remaining non-image blockers. Verify before/payload/after/rollback receipts for actual account changes. Match independent audit verdicts to exact evidence revisions. Record missed dates and unresolved claims/economics/stock inputs. Image work stays on operator hold. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260928-INPUT · overdue · due 2026-09-28

September 28: Verify replenishment and formula readiness; update launch/hold and pacing. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260928.

BPS only, September 28, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Verify replenishment and formula readiness; update launch/hold and pacing. Check actual FBA availability, not just the September 28 ETA. Preserve no-ship, same-ASIN and formula-flip-on-FBA-live rules for the three reformulating variants. Green Apple flagship has its own stock gate. Recompute reserve and remaining test allowance. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260928. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-STOCK-20260928 using metric stock_and_formula_readiness_readout; record achieved only when its full acceptance condition is met: One dated per-ASIN stock/reserve/formula readout with confirmed availability or explicit hold, covering the selected test and reformulation commitments. ETA alone cannot satisfy FBA availability. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260929-INPUT · overdue · due 2026-09-29

September 29: Prepare the closeout with mature cohorts and an October follow-up list. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260929.

BPS only, September 29, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Prepare the closeout with mature cohorts and an October follow-up list. Reconcile spend, orders, reportable NTB, costs and stock by product/campaign/targeting lane. Flag unresolved attribution, cost and source gaps. Draft continue/revise/stop-or-hold recommendation; identify actual executed work separately from drafts. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260929. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-AUDIT-20260930-INPUT · overdue · due 2026-09-30

September 30: Publish the September sprint closeout and assign October follow-up. Plus the daily source-linked audit and Cockpit update.

Owner: client-growth + mode7-audit. Agency coordinator: client-growth. Action: BPS-NTB-AUDIT-20260930.

BPS only, September 30, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Publish the September sprint closeout and assign October follow-up. Assess each of the five checkpoint milestones as achieved/missed/inconclusive using its exact metric and evidence. Assess daily coverage separately. Publish actual changes, spend, reportable NTB, verified or unknown contribution, remaining holds and named next actions. A documented HOLD completes the decision record, not a launch or growth goal. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260930. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-CLOSEOUT-20260930 using metric september_ntb_closeout; record achieved only when its full acceptance condition is met: One source-linked September closeout assessing all checkpoint outcomes and daily coverage; actual changes, mature/immature cohorts, spend, NTB and verified/unknown contribution; exact October dates and owners. No financial lift is inferred from completed records. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: Dated audit evidence and matching Cockpit/progress update exist; unknown business inputs and independent audit failures remain explicitly open.

BPS-NTB-KICKOFF-20260917-INPUT · overdue · due 2026-09-17

Current verified starting state for autonomous NTB sprint execution.

Owner: client-growth + mode7-audit + inventory-replenish. Agency coordinator: client-growth. Action: BPS-NTB-KICKOFF-20260917.

BPS only. Begin the authorized September NTB sprint now. Read the pinned report text and current plan. Use existing authenticated read tools to verify current BPS campaign status for 149084567777977 and the September 14 discovery campaigns, expiration/monitor state, current sellable stock and replenishment evidence for B003YSVBEO/B0037US3UY/B0016NDJGM, and the existing Green Apple v4 artifact files. Capture source timestamps, exact identity and evidence paths. Reuse available current sources; do not repeat completed creative work. Produce the opening baseline/readiness matrix and route exact missing inputs/repairs to the existing owner. This is actual source verification, not another plan or a report paraphrase. Write the substantive result, register evidence and refresh progress; no account mutation, spend increase, price change or messages. Missing access is a named blocker; never substitute historical report values as current. Preserve shared ownership and previous results. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction. Explicitly treat existing image assets as read-only inventory; do not invoke an image-production or Canva executor.

Close only when: A dated opening baseline/readiness matrix names current verified sources or exact unavailable inputs, campaign/discovery state, per-product stock/creative gates, changes made or none, and the next canonical owner/action; Cockpit progress records that result.

BPS-NTB-MATURITY-20261001-INPUT · overdue · due 2026-10-01

Post-sprint attribution reconciliation and later cohort readout dates.

Owner: mode7-audit + client-growth. Agency coordinator: client-growth. Action: BPS-NTB-MATURITY-20261001.

BPS only. Re-pull the September 16 and earlier cohorts with verified campaign-specific attribution windows; reconcile against the September 30 closeout. For later test interactions, calculate and assign the actual maturity dates rather than claiming October 1 settles everything. Update existing Cockpit milestones without changing account settings or extending budgets. Record unknowns and route the next readout to the existing owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Close only when: A dated source-linked reconciliation identifies mature/immature cohorts, reportable NTB and exact next readout dates, with a matching Cockpit update.

Latest cycle (2026-10-31T06:27:18.506Z): needs_reconciliation — Missing structured execution/reconciliation evidence

Financial targets are existing contract references pending the stated validation; these dates do not change spending authority. Quarterly actuals are assessed after settlement.

Weekly progress

COULD-NOT-MEASURE · As of 2026-10-31T06:27:18.140Z

BioPharma Scientific: 2 execution result(s) recorded in the last 7 days; 22 overdue action(s). Financial or evidence gaps remain.

Reporting window: from: 2026-09-28; through: 2026-10-27

MetricReported value
revenue39717.14
orders543
units632
ad Spend626.72
reported Net12564.13
tacos Pct1.58
reconciliation Difference3615.5

PROVISIONAL — reported net is not a verified contribution margin; reconcile itemized costs and refunds.

No period comparison is available.

What changed

  • BPS-NTB-AUDIT-20260921 — blocked — Stopped run reconciled; unfinished action is eligible for safe resume
  • BPS-NTB-AUDIT-20260922 — needs_reconciliation — Missing structured execution/reconciliation evidence

Open issues

  • Reported net has an unexplained $3615.50 difference from the displayed revenue/cost lines.
  • Executor needs_reconciliation: Missing structured execution/reconciliation evidence
  • Codex audit COULD-NOT-MEASURE: The supplied preparation artifact documents a 2026-09-10 inventory read and a needs_input decision, but lacks the required readable merchant-scoped Deals result from the 2026-09-15 recheck or later. It therefore cannot establish timely preparation, continued ineligibility, or a completed sign-off packet. No price or account mutation is claimed.
  • 30 Codex audit(s) have unresolved findings; inspect audit evidence before dependent work.

Next actions

  • Verify current financial bridge and SKU economics — blocked — 2026-09-13 — Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Collect same-window P&L, itemized fees/refunds, costed SKU identity and COGS coverage. Reconcile contribution vs posted net and fixed costs. Use the client's own source and enumerate missing input rows; do not replace unknowns with averages. Save the input body/hash/window and reproducible calculation. Keep target references provisional until validated. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
  • Verify saleable stock, offers and account risks — in_progress — 2026-09-13 — Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Read current saleable/reserved/inbound stock, velocity and stock-hold instructions; inspect offer/account/catalog risks and prior repairs. Check existing claims before proposing another. Save dated current evidence and separate protective work from optional growth; no account mutations. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
  • Select one evidence-backed growth or loss-recovery driver — in_progress — 2026-09-16 — Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Use ECONOMICS and RISK evidence plus own search-query/conversion/ads history. Rank opportunities by verified contribution potential, stock feasibility, effort and confidence; select one driver. For ads-only work use royalty efficiency. Keep discovery findings attached to existing actions; do not create duplicate campaigns/listings or change prices. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
  • Prepare a measurable, bounded intervention for the chosen driver — open — 2026-09-19 — Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Design the selected intervention at unchanged prices. Record a fresh immutable baseline window, own-unit forecast, spend/resource cap supported by verified economics, stop rule, rollback, matched post-intervention readout and confounders. Research and staging only. List exact gate evidence required before any account change; preserve parked/launch restrictions. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
  • Publish client progress, unresolved inputs and next actions — open — 2026-09-11 — Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Review plan execution and audit outcomes. Prepare actual-versus-target reference with matching periods, evidence-backed completed work, unknowns and next priority; distinguish descriptive financial movement from causal lift and report operator interventions/time where measured. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.

Latest execution: claude — needs_reconciliation — BPS-NTB-AUDIT-20260922.

  • claude — failed — Missing structured execution/reconciliation evidence
Weekly evidence and sources
facts
source: C:\Users\miraf\projects\mode6-catalog-gap-audit\inputs_BPS\BPS_ProfitAndLoss_2026-09-28_2026-10-27.csv; period: from: 2026-09-28; through: 2026-10-27; modified At: 2026-10-28T07:17:39.831Z
evidence
Not recorded
execution Evidence
source Path
Not recorded

Codex audit

COULD-NOT-MEASURE — The supplied preparation artifact documents a 2026-09-10 inventory read and a needs_input decision, but lacks the required readable merchant-scoped Deals result from the 2026-09-15 recheck or later. It therefore cannot establish timely preparation, continued ineligibility, or a completed sign-off packet. No price or account mutation is claimed.

Pending: 28. Coverage is limited to registered work and supplied evidence.

Actions and next steps

ActionOwnerStatusDueNext action
Reconcile current client priorities, prior work and constraintsclient-growth + mode6k + ppc-recapcompleted2026-09-11Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Read current client documents, action/lever history and unresolved tasks; deduplicate completed work and identify existing owners. Produce a client-specific priority and constraint map with explicit unresolved requests. Do not send messages or change accounts.
Verify current financial bridge and SKU economicsmom-report + catalog-econ + mode6kblocked2026-09-13Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Collect same-window P&L, itemized fees/refunds, costed SKU identity and COGS coverage. Reconcile contribution vs posted net and fixed costs. Use the client's own source and enumerate missing input rows; do not replace unknowns with averages. Save the input body/hash/window and reproducible calculation. Keep target references provisional until validated. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
Verify saleable stock, offers and account risksinventory-replenish + amazon-featured-offer + mode10-daily-checkin_progress2026-09-13Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Read current saleable/reserved/inbound stock, velocity and stock-hold instructions; inspect offer/account/catalog risks and prior repairs. Check existing claims before proposing another. Save dated current evidence and separate protective work from optional growth; no account mutations. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
Select one evidence-backed growth or loss-recovery drivermode6 + mode6k + mode7-strategyin_progress2026-09-16Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Use ECONOMICS and RISK evidence plus own search-query/conversion/ads history. Rank opportunities by verified contribution potential, stock feasibility, effort and confidence; select one driver. For ads-only work use royalty efficiency. Keep discovery findings attached to existing actions; do not create duplicate campaigns/listings or change prices. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
Prepare a measurable, bounded intervention for the chosen drivermode6k + client-growth + self-checkopen2026-09-19Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Design the selected intervention at unchanged prices. Record a fresh immutable baseline window, own-unit forecast, spend/resource cap supported by verified economics, stop rule, rollback, matched post-intervention readout and confounders. Research and staging only. List exact gate evidence required before any account change; preserve parked/launch restrictions. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
Publish client progress, unresolved inputs and next actionsclient-growth + mode6kopen2026-09-11Read existing dependency and execution evidence from Sync/client-growth/runs/BPS/index.json before starting; preserve completed/partial effects. Client BPS only. Read the canonical registry, KPI contract and current client requests/stock holds. Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof. Review plan execution and audit outcomes. Prepare actual-versus-target reference with matching periods, evidence-backed completed work, unknowns and next priority; distinguish descriptive financial movement from causal lift and report operator interventions/time where measured. September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
Daily client decisions, execution and outcome reviewclient-growthin_progressNot recordedReview the deterministic Mode6K intake for this client and reuse its canonical goals, selected levers, existing owners and measured results. This review cannot choose or apply independent account changes. The dispatcher routes a selected actionable lever to its owner under shared action ownership; Mode7 owns advertising. Report only a due review, changed input or unresolved decision, reusing specialist evidence and preserving the price lock. During September 17–30 also inspect the dated NTB audit actions and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; missed audit/update days must remain visible. Execute through existing selected ownership only. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
TikTok → Amazon: Attribution tags live on every TikTok destination, first clicks measuredtiktok-shop-opsin_progressNot recordednode ~/.claude/skills/tiktok-shop-ops/tools/seed_calc.mjs --client BPS --asin <hero ASIN> --price <client price> --out ~/Sync/client-growth/evidence/BPS/tiktok-seed-calc-2026-09-11.md; then amazon-attribution dormant-tag repair (tiktok_<creator>_<sku> tags), creator briefs via influencer-creator-ops Stage 1–3, organic calendar via organic-social-content; record each step with --evidence September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
Reformulated NanoGreens (3 SKUs): hold, flip on FBA-live day, relaunchclient-growth + inventory-replenish + mode4 + mode5open2026-09-28Client BPS only. (1) Enforce the no-ship hold on B00NLQS7E6 / B073XX16D8 / B073XW1FKC — the weekly Monday inventory list must mark them HOLD, not reorder. (2) Sellerboard 2026-09-11: B00NLQS7E6 85u @2.68/day = 34 days (covers 09-28); B073XX16D8 60u @0.40/day; B073XW1FKC 32u @0.34/day — no stock-out before the new stock lands; re-check weekly. (3) Before 09-28: get new-formula label art, supplement-facts panel and photos from Jen/Rick/Bruna; prepare mode4 copy + mode5 image set as DRAFT artifacts under the SAME UPC/ASIN. (4) Confirm the inbound shipment is created with the new-formula expiry entered. (5) Flip copy/images ONLY on the day the new units are live/available at FBA — verify FBA available qty > 0 first, capture before-state. Same for Probiotic Green Apple in early October. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
NSF GMP review clears NanoGluco B00W81D52E (Order 00002798)client-growth + amazon-compliancein_progress2026-10-11Client BPS only. NSF Order 00002798 submitted 2026-09-11 by Jen ($500, cGMP cert only, ~30 days). (1) Recommend Jen reply to the NSF order email with one line: "Health Specialties Manufacturing is the manufacturing division of The GHT Companies — same company" (cheap insurance; the lot number she supplied maps to a COA on Health Specialties letterhead). (2) Ask whether GHT also manufactures NanoMinerals B078X2FWZJ — the same cGMP certificate would clear compliance 100459 due 2026-11-22 (ticket 86eyp8xp2). (3) Watch the marketing mailbox + Seller Central account health for the NSF/Amazon notice; on clear, verify the NanoGluco notice is lifted. (4) If nothing by 2026-10-11, have Jen/Rick chase NSF with the order number.
Operator-selected bounded competitor discovery testmode7-runin_progressNot recordedRun prepared guarded discovery intent C:/Users/miraf/projects/miraflores-fleet-evidence/tasks/mode7-conquest-guards-20260913/activation-20260914/BPS-intent.json September 17 operator update: work within C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md; preserve existing action identity/status and evidence. September 30 is the NTB sprint delivery checkpoint, not a blanket extension of spend authority or attribution windows.
NTB daily audit and Cockpit update — 2026-09-17client-growth + mode7-auditcompleted2026-09-17BPS only: 2026-09-17 NTB sprint audit and Cockpit update. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and the existing source report. Verify current source timestamps and client/ASIN identity; available units, baseline daily demand, inbound ETA and formula/stock holds; actual changes and before/payload/after/rollback evidence; campaign state, target relevance, spend, clicks, purchases and eligible SB/Display NTB metrics with attribution maturity; per-SKU economics and open audit findings; creative readiness and today's checkpoint. Separate brand defense, own-ASIN cross-sell, generic search, external conquest and external Attribution. SP purchases are acquisition proxies, never NTB counts. Do not sum overlapping platform orders. Record today's findings, changes made (or none), blocked work, exact next owner/action/due date, source paths/hashes and audit status; refresh BPS progress and Cockpit after recording. Missing or stale sources are COULD-NOT-VERIFY. Do not backfill a missed audit as completed. Advance the next dated sprint checkpoint through its existing action owner; report readiness and blockers. No price, coupon, subscription, deal or repricer changes; no messages or creator outreach. No new campaign, budget increase or expired-test extension from this planning/audit action. Preserve existing shared locks, Mode6K selection and Mode7 execution ownership. The report's $14 CAC/$140 and $1 CPC examples are proposals, not approved limits; historical $29.32 CAC is not a current per-SKU allowance. Preserve 30 baseline-demand days before any test; at most ten incremental units per tested candidate is a ceiling, not a sales target. Green Apple fails the report-date reserve test. Verify fresh sources before applying any gate. Write a substantive dated audit artifact with source evidence; attach it through client_growth_plan.mjs record --client BPS --action BPS-NTB-AUDIT-20260917. Completion certifies the audit/update deliverable only, never account execution or financial lift. Resolve scorecard input BPS-NTB-AUDIT-20260917-INPUT with source-backed evidence through client_growth_scorecard_update.mjs when its daily record exists. The independent audit lane must review the evidence; failed/missing audit stays visible. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 18: NTB work, audit and Cockpit update — Reconcile campaign classification and expired discovery authorization; prepare exact target repairs.Ads + Mode6K; accountable: Brian / client-growthblocked2026-09-18BPS only, September 18, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Reconcile campaign classification and expired discovery authorization; prepare exact target repairs. A dated campaign/target matrix separates brand defense, own-ASIN cross-sell, generic and external acquisition. Verify failed Display campaign state. Prepare specific scientific PHRASE and mineral supplements BROAD corrections with Mode7; preserve useful brand terms. Read current results/state of the September 14 discovery test; no expired authorization is extended. Recheck Brand Tailored Promotion audience eligibility read-only. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260918. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-MEASUREMENT-20260918 using metric measurement_and_repair_package; record achieved only when its full acceptance condition is met: One current campaign/target classification and repair package, expired-test disposition, attribution windows and named Mode7 executor. Proposed changes are not live changes. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 19: NTB work, audit and Cockpit update — Reconcile Green Apple product text, claims and current-format evidence.Catalog + claims; accountable: Brian / client-growthblocked2026-09-19BPS only, September 19, 2026. Reconcile Green Apple product text, claims and current-format evidence. Check current label, ingredients, serving/directions and claim substantiation. Inventory existing assets read-only to identify launch prerequisites. Resolve the liquid-volume conflict in the written brief without inventing an amount. Record any visual issue as held; do not create, edit, upload or publish images. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 20: NTB work, audit and Cockpit update — Resolve NanoReds sugar/category conflicts and prepare a text-only correction brief.Catalog + claims; accountable: Brian / client-growthblocked2026-09-20BPS only, September 20, 2026. Resolve NanoReds sugar/category conflicts and prepare a text-only correction brief. Verify No Sugar Added versus added sugar and Weight Loss classification using current authoritative product evidence. Prepare exact supported textual corrections and source references for the existing catalog owner. No image or A+ visual changes. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 21: NTB work, audit and Cockpit update — Finish NanOmega product-text and targeting readiness; review all three written briefs.Catalog + ads; accountable: Brian / client-growthblocked2026-09-21BPS only, September 21, 2026. Finish NanOmega product-text and targeting readiness; review all three written briefs. Clarify powder format, use and approved label amounts in the written brief, distinguishing 1,000 mg linolenic acid from 100 mg DHA. Deliver three evidence-linked product-text/claim/targeting briefs. Video script recommendations may be written as text only; no image or video asset generation, editing or upload. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 22: NTB work, audit and Cockpit update — Validate current per-product economics and acquisition stock allowance.Finance + inventory; accountable: Brian / client-growthneeds_reconciliation2026-09-22BPS only, September 22, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Validate current per-product economics and acquisition stock allowance. Reconcile current price, existing discounts/subscriptions, fees, refunds and costs. Compute contribution before acquisition and a supported loss/spend limit; no price edits. Record current sellable units, baseline demand, 30-day reserve, expected inbound and maximum incremental allowance. Historical blended CAC and $29.32 are not usable overrides. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260922. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 23: NTB work, audit and Cockpit update — Prepare one executable test specification and measurement sheet.Ads + Mode6K; accountable: Brian / client-growthscheduled2026-09-23BPS only, September 23, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Prepare one executable test specification and measurement sheet. Select one candidate product and one acquisition source using verified product readiness, demand and economics. Specify current fixed offer, one variable, exact campaign/targets, finite total cap, CPC basis, maximum incremental units, attribution windows, monitoring owner, hard-stop conditions and rollback. Select a lane with reportable NTB metrics if NTB is the measured outcome; label SP results as proxies. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260923. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 24: NTB work, audit and Cockpit update — Record GO or HOLD; route an eligible test through the existing account owner.Brian + Mode6K / Mode7; accountable: Brian / client-growthscheduled2026-09-24BPS only, September 24, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Record GO or HOLD; route an eligible test through the existing account owner. All launch gates require dated evidence. GO requires current stock and economics, product/claims approval, released applicable growth hold, a selected canonical action, verified monitoring and finite spending authority. Execute only through the existing Mode7 owner and shared lock; this local action stages the handoff. If any gate fails, record HOLD, exact missing evidence, owner and next review. Do not mark a test launched until the owning action has live after-state evidence. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260924. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-DECISION-20260924 using metric evidenced_launch_or_hold_decision; record achieved only when its full acceptance condition is met: One written decision with evidence for each launch gate, proposed approved-limit basis, stop/rollback/monitoring plan, and exact next owner. HOLD may satisfy a truthful decision record but does not satisfy launch or financial delivery. Live launch is separately verified on the owning action. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 25: NTB work, audit and Cockpit update — Audit the selected lane or held decision; check audience eligibility.Ads + client-growth; accountable: Brian / client-growthscheduled2026-09-25BPS only, September 25, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Audit the selected lane or held decision; check audience eligibility. Read actual changes from owner receipts and compare spend/stock against the approved cap. If no test launched, report that explicitly and advance the named readiness work. Recheck Brand Tailored Promotion eligibility read-only. Record attribution maturity and source-specific results; no coupon or deal activation. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260925. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 26: NTB work, audit and Cockpit update — Review query relevance, CPC and losses using mature evidence.Ads + finance; accountable: Brian / client-growthscheduled2026-09-26BPS only, September 26, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Review query relevance, CPC and losses using mature evidence. Apply the approved test decision rules only through the existing owner. Separate early diagnostics from matured conversion evidence. Review around one approved target CAC without an order and normally stop around two only after the relevant lag and using the written experiment rule; no automatic reuse of the report examples. Enforce absolute spend/stock limits even while attribution is immature. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260926. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 27: NTB work, audit and Cockpit update — Audit execution evidence, missing daily updates and remaining non-image blockers.Client-growth + audit; accountable: Brian / client-growthscheduled2026-09-27BPS only, September 27, 2026. Audit execution evidence, missing daily updates and remaining non-image blockers. Verify before/payload/after/rollback receipts for actual account changes. Match independent audit verdicts to exact evidence revisions. Record missed dates and unresolved claims/economics/stock inputs. Image work stays on operator hold. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md. Perform the daily audit and Cockpit update: current source timestamps, work completed, changes made or none, spend/orders/NTB maturity, stock, blockers, next owner/action/date. Internal update target 17:00 America/Lima. Register source-linked result evidence. This local action performs reads and writes local text artifacts; route any account mutation to the existing selected owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 28: NTB work, audit and Cockpit update — Verify replenishment and formula readiness; update launch/hold and pacing.Inventory + catalog; accountable: Brian / client-growthscheduled2026-09-28BPS only, September 28, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Verify replenishment and formula readiness; update launch/hold and pacing. Check actual FBA availability, not just the September 28 ETA. Preserve no-ship, same-ASIN and formula-flip-on-FBA-live rules for the three reformulating variants. Green Apple flagship has its own stock gate. Recompute reserve and remaining test allowance. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260928. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-STOCK-20260928 using metric stock_and_formula_readiness_readout; record achieved only when its full acceptance condition is met: One dated per-ASIN stock/reserve/formula readout with confirmed availability or explicit hold, covering the selected test and reformulation commitments. ETA alone cannot satisfy FBA availability. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 29: NTB work, audit and Cockpit update — Prepare the closeout with mature cohorts and an October follow-up list.Finance + ads; accountable: Brian / client-growthscheduled2026-09-29BPS only, September 29, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Prepare the closeout with mature cohorts and an October follow-up list. Reconcile spend, orders, reportable NTB, costs and stock by product/campaign/targeting lane. Flag unresolved attribution, cost and source gaps. Draft continue/revise/stop-or-hold recommendation; identify actual executed work separately from drafts. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260929. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
September 30: NTB work, audit and Cockpit update — Publish the September sprint closeout and assign October follow-up.Brian + client-growth; accountable: Brian / client-growthscheduled2026-09-30BPS only, September 30, 2026. Read C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\SPRINT.md and C:\Users\miraf\projects\claude-mode-skills\artifacts\bps-ntb-sprint-20260917\report-text-verified.txt. Deliverable: Publish the September sprint closeout and assign October follow-up. Assess each of the five checkpoint milestones as achieved/missed/inconclusive using its exact metric and evidence. Assess daily coverage separately. Publish actual changes, spend, reportable NTB, verified or unknown contribution, remaining holds and named next actions. A documented HOLD completes the decision record, not a launch or growth goal. Every day append an immutable dated evidence record and update Cockpit: completed work; account changes actually made or none; spend/orders/reportable NTB and source windows; attribution maturity; stock reserve; current blockers; next owner/action/date. Internal reporting target is 17:00 America/Lima. A queue slot is not completion. If displaced by protective work, unavailable sources, locks or failed execution, show MISSED/HELD and recovery owner; never backdate a live audit. Resolve that dated input only when its evidence and update exist. Independent audit status must identify the exact action/evidence hash; pending backlog stays PENDING, never PASS. Perform the named local production/read-only deliverable within this existing daily action so daily reporting does not consume the only slot without advancing the sprint. Source gaps block the affected output, not all unrelated creative preparation. No price changes or messages. Do not make account changes from this local action: route them to the selected canonical Mode6K/Mode7 owner. Preserve all original account, stock, cost, approval, single-writer and spending constraints. Preserve original immutable action identity BPS-NTB-AUDIT-20260930. Attach work and audit artifacts through the existing result recorder; use the existing scorecard evidence recorder for supported milestone/input assessments. Assess milestone BPS-NTB-CLOSEOUT-20260930 using metric september_ntb_closeout; record achieved only when its full acceptance condition is met: One source-linked September closeout assessing all checkpoint outcomes and daily coverage; actual changes, mature/immature cohorts, spend, NTB and verified/unknown contribution; exact October dates and owners. No financial lift is inferred from completed records. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.
Start NTB execution: verify current campaign, stock and creative readinessclient-growth + mode7-audit + inventory-replenishblocked2026-09-17BPS only. Begin the authorized September NTB sprint now. Read the pinned report text and current plan. Use existing authenticated read tools to verify current BPS campaign status for 149084567777977 and the September 14 discovery campaigns, expiration/monitor state, current sellable stock and replenishment evidence for B003YSVBEO/B0037US3UY/B0016NDJGM, and the existing Green Apple v4 artifact files. Capture source timestamps, exact identity and evidence paths. Reuse available current sources; do not repeat completed creative work. Produce the opening baseline/readiness matrix and route exact missing inputs/repairs to the existing owner. This is actual source verification, not another plan or a report paraphrase. Write the substantive result, register evidence and refresh progress; no account mutation, spend increase, price change or messages. Missing access is a named blocker; never substitute historical report values as current. Preserve shared ownership and previous results. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction. Explicitly treat existing image assets as read-only inventory; do not invoke an image-production or Canva executor.
October 1: reconcile September NTB attribution and later cohort review datesmode7-audit + client-growthscheduled2026-10-01BPS only. Re-pull the September 16 and earlier cohorts with verified campaign-specific attribution windows; reconcile against the September 30 closeout. For later test interactions, calculate and assign the actual maturity dates rather than claiming October 1 settles everything. Update existing Cockpit milestones without changing account settings or extending budgets. Record unknowns and route the next readout to the existing owner. OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

30-day plan and quarterly roadmap

First 30 days
label: First 30 days; from: 2026-09-09; through: 2026-10-08; priority: Establish current client economics and constraints, resolve input blockers, and stage one measurable driver.
September NTB sprint
label: September NTB sprint; from: 2026-09-17; through: 2026-09-30; priority: Through September 30, deliver the BioPharma NTB sprint: Green Apple creative first, then Reds and Omega; verified acquisition measurement, one gated current-price test decision, daily audits and Cockpit updates. Continue the existing contribution goal and reformulation/compliance commitments.

Starting figures and what we still cannot measure

status
NOT-VERIFIED-FOR-ROLLOUT
source
C:\Users\miraf\Sync\client-growth\onboarding\BPS\sources.json
note
Archived actuals are evidence references, not a current financial baseline; ECONOMICS validates its own window and quality.

Targets

status
CONTRACT-REFERENCE-REQUIRES-CURRENT-VALIDATION
financial Authority
mode6k/kpi_contracts.json clients.BPS
contract
status: DERIVED (2026-07-05..2026-08-04) — deterministic, derive_contract.py; posture: scale-up; targets: cm dollars monthly: 13632.86; tacos ceiling: 0.3666; ntb cac ceiling: 29.32; provenance: DERIVED 2026-07-05..2026-08-04 from staged Sellerboard P&L (MODE 7 pull) [2026-08-18]: tacos_ceiling = cm_before_ads 15,171.34 / sales 41,384.50 = 0.3666 (BE-ACoS). cm_before_ads basis: posted profit + ad spend (reaches every deduction, itemized or not). cm_dollars_monthly = 13,632.86 = best posted net across 2026-07-05..2026-08-04. Latest net +13,632.86, ad spend 1,538.48, TACoS 3.7% vs ceiling 36.7%. MARGIN BASIS (as configured 2026-08-22T19:51Z; sellerboard serves no historical settings, so this is NOT verified for the derived window 2026-07-05..2026-08-04) measured off the account's own sellerboard settings: margin denominator = GROSS sales; VAT not deducted; multi-channel orders EXCLUDED; FBA shipping chargeback/giftwrap excluded from sales; pending returns assumed unsellable; storage fees booked in the month charged.; milestone ladder: name: M0 true landed break-even; metric: cm_dollars_monthly; value: 0; sized from: definitional — CM$ >= 0 post-ads; name: M1 hold best-posted CM$ $13,632.86; metric: cm_dollars_monthly; value: 13632.86; sized from: highest net across the months on disk (2026-07-05..2026-08-04): 2026-07-05..2026-08-04 posted +13,632.86 — a level this account has ACTUALLY achieved, not an assumed lift; active milestone: 1; no target reason: Not recorded; unblocks when: Not recorded; margin basis: available: true; settings: vat use: false; use net sales for margin calculation: false; cogs for oversold units: last_batch_price; principal only: true; non amazon: true; realistic refunds: true; pick pack price per item: 0; amortize storage fees daily: false; line: MARGIN BASIS (as configured 2026-08-22T19:51Z; sellerboard serves no historical settings, so this is NOT verified for the derived window 2026-07-05..2026-08-04) measured off the account's own sellerboard settings: margin denominator = GROSS sales; VAT not deducted; multi-channel orders EXCLUDED; FBA shipping chargeback/giftwrap excluded from sales; pending returns assumed unsellable; storage fees booked in the month charged.; read at: 2026-08-22T19:51Z; window: 2026-07-05..2026-08-04
goal Id
BPS-CONTRIBUTION
new Growth Target
Not recorded
reason
No new client revenue promise inferred during onboarding.
next Input
Refresh own same-window economics and verify the active milestone before sizing a new growth target.

Rules for spending and scaling

1
No price, discount, coupon, shipping-charge or repricer changes. No messages, purchases or client-account mutations from these research actions.
2
Preserve existing client instructions and inventory/advertising holds; absence of a copied constraint is not authorization to ignore its source.
3
Validate BioPharma Scientific catalog identity, supplement claims and per-ASIN costs before scale; preserve client-specific NTB CAC ceiling as a reference requiring current proof.
4
Never infer causal lift or time saved from completed tasks; use the experiment ledger and independent evidence review.
5
CLIENT HOLD 2026-09-11 (Jen Linnett, Slack #biopharma-amazon): NO further FBA shipments of NanoGreens Strawberry B00NLQS7E6, NanoGreens + Probiotic Strawberry B073XX16D8 or NanoGreens + Probiotic Green Apple B073XW1FKC until the reformulated stock arrives. Old formula sells through first. Reformulation keeps the SAME UPC (listing edit, never a new ASIN). Listing copy/images flip ONLY on the day the new stock is live at FBA, never before.
6
CLIENT DATES 2026-09-11: new-formula NanoGreens Strawberry + NanoGreens + Probiotic Strawberry target in-stock 2026-09-28; NanoGreens + Probiotic Green Apple early October 2026. Contacts while Jen is out: Rick and Bruna Thornton.
7
NSF GMP review for NanoGluco B00W81D52E is IN FLIGHT: NSF Order 00002798, submitted 2026-09-11 by the client ($500, cGMP certificate only, no COA, no samples, ~30 calendar days => expect ~2026-10-11). Certificate is in The GHT Companies name; the COA letterhead says Health Specialties Manufacturing (same company). Do NOT file a second NSF request or pay again.
8
NanoGreens lot NG26132 is best-by 05/2028 and NanoReds lot NR26188 is 07/2028 (client-confirmed 2026-09-10): units Amazon flagged as expired are NOT expired and may re-enter on a shipment with the correct date entered (05/01/2028 is a valid entry for a 05/2028 label; the day does not matter).
9
OPERATOR SEPTEMBER 17: DO NOT TOUCH IMAGES YET. No image generation, editing, redesign, Canva upload/import/export, gallery/A+ visual production or publication, or listing-image replacement. Existing image files may be inventoried read-only as evidence. Continue all other authorized non-price sprint work autonomously; existing stock/economics/approval/ownership limits still apply. Image work resumes only on an explicit later operator instruction.

Who does the work and checks it

cadence
daily: Shared all-client daily fleet schedule, America/Lima
engine
claude
fallback
codex
live Execution
true
automatic Actions
23
total Actions
27

Plan source: C:\Users\Brian\Sync\client-growth\plans\BPS.json. Completed work and business results require dated evidence; planned actions do not prove results.

What I am working on — 8

  1. 28 visits a month raised 4 days ago

    ME — changing bids, budgets and campaigns is already signed off — I fire one, re-read it live, then do the rest

    owner: mode7-run - in the next MODE 7 run for BPS, grow new-to-brand orders: lean budget into the top NTB campaigns (BD | ALL | SPA-KTA | EX (25 NTB/90d); ALL | SPA-KTA | Branded | Dyn Down Only (22 NTB/90d); GRN | SPA-PTA | Target Competitor | Higher Price | TOS 100 (19 NTB/90d)); retarget the clicked-not-bought pool (112 shoppers); pair Sponsored Products with Sponsored Brands where they overlap (SP+SB converts 1.28x SP alone). Keep NTB cost under the $26.79 NTB CAC ceiling. No price change.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. This one is sized at 28 visits a month — that is not dollars.

    the evidence behind it
    BPS new-to-brand orders 27.49/mo vs goal 40.0/mo (pace 0.687, at-risk); shortfall 12.5 NTB orders/mo; operator-approved panel NTB goal 40/mo (90-day AMC baseline 29.7/mo); AMC window 2026-09-21..2026-10-21; NTB CAC ceiling 26.79; delta = sessions/mo at order CVR 45.09%

    Tracked: on the task board at https://app.clickup.com/t/z8y71wz8u4 · finding goal-bps-2026-10-ntb.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  2. $589 a month raised 11 days ago

    ME — opening or answering a case with Amazon is already signed off, one at a time

    Open the FBA reimbursement case in Seller Central for BPS NanoGreens10-stickerless (B003YSVBEO): 4 lost units plus 17 unknown-event units, and 1 lost on B00NLQS7E6, before the claim window closes.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. This one is worth $589 a month.

    the evidence behind it
    BPS Sept 2026 ledger: 7 lost + 3 damaged + 17 unknown = 27 units x 21.81 avg COGS (BPS_verified.json) = 588.78 one-time at cost, conservative floor

    Tracked: on the task board at https://app.clickup.com/t/z8y71x08qf · finding ledgereom-BPS-2026-09-unreconciled-units.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  3. $382 a month raised 17 days ago

    ME — changing bids, budgets and campaigns is already signed off — I fire one, re-read it live, then do the rest

    Review the storage footprint of the slowest-turning SKUs -- storage is running above 2%% of the catalog's monthly margin.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. This one is worth $382 a month.

    the evidence behind it
    MODE 6 engine, source report Inventory Planning (C4): Next month's FBA storage is estimated at $382.29 against $13287 of monthly contribution margin -> $382/mo at stake (MEASURED). Action: Review the storage footprint of the slowest-turning SKUs -- storage is running above 2%% of the catalog's month

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0qy9 · finding mode6-bps-fba-fee-dimensional-account-of-margin.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  4. 25 visits a month raised 15 days ago

    ME — catalog details, images and settings are mine — the four things customers read are not

    mode5: test the main image against the top-3 on this query; price is the operator's call and is handed over, never changed.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. This one is sized at 25 visits a month — that is not dollars.

    the evidence behind it
    [CLICK] "greens powder" wk ending 2026-10-10: impr share 0.2% -> click share 0.0% -> cart 0.1% -> purchase share 0.2% (market 649 purchases/wk, ours 1; 2 ASIN(s) pulled). Failing 1 of the last 1 weeks. Worth ~5.7 clicks/wk at share parity with the stage before. Source: SP-API SQP (sqp_funnel_gap.mjs

    Tracked: on the task board at https://app.clickup.com/t/z8y71x129d · finding sqp-funnel-bps-greens-powder-click.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  5. not sized raised 51 days ago

    ME — listing wording on a Miraflores client is mine; it ships through the copy lane and the claims check, never as a raw write

    Recheck published hotspot accessible text after propagation; assess a module replacement only if accessibility remains broken.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    B0FST44W79: 13 editor descriptions populated; hotspot background renders blank alt in preview despite populated field. Downloads/BPS-NanoCreatine-Audit-2026-09-09/aplus/final-ui-evidence.json. Effect size unknown, confidence zero for any conversion lift.

    Tracked: on the task board at https://app.clickup.com/t/86eyvtcve · finding bps-nanocreatine-aplus-hotspot-alt-rendering.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  6. not sized raised 46 days ago

    ME — listing wording on a Miraflores client is mine; it ships through the copy lane and the claims check, never as a raw write

    enrol B083VVZS44 in Amazon Vine from the Seller Central Vine dashboard, which opens on Get started with Amazon Vine and is not gated on this account.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    Seller Central Vine dashboard read 2026-09-15 with the correct merchant.d mcid: /vine/vine-dashboard redirects to /vine/welcome_to_vine, the marketing splash. Account renders as BioPharma Scientific LLc, Account Health Healthy. CTA scan returned Get started with Amazon Vine, hasEnrollWord true, notE

    Tracked: on the task board at https://app.clickup.com/t/86eywr465 · finding bps-b083vvzs44-vine-never-enrolled-2026-09.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  7. not sized raised 59 days ago

    ME — catalog details, images and settings are mine — the four things customers read are not

    upload BPS_rufus_TREATMENT_upload_2026-09-01.xlsm in Seller Central, then run /mode4 on BPS_rufus_mode4_workorder_2026-09-01.csv.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    Monthly resweep 2026-09-01 (first cycle for BPS in this lane): 22 SKUs avg 33.6% completeness, 17/22 below 50%, 9/22 below 25%, worst Parent-NanoGreens-2026 0.0%; auto-fix=anchored, BPS_rufus_TREATMENT_upload_2026-09-01.xlsm (14 SKUs) ready in Downloads. No prior session baseline on file for BPS — s

    Tracked: on the task board at https://app.clickup.com/t/86eytr40g · finding rufus-attribute-sweep-BPS-attr-completeness.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  8. not sized raised 32 days ago

    ME — changing bids, budgets and campaigns is already signed off — I fire one, re-read it live, then do the rest

    Size a Sponsored Brands budget increase for BPS on the campaigns that share SP shoppers through mode7-strategy and hand it over for spend sign-off.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    AMC 2026-08-27..2026-09-26: shoppers who saw SP and SB converted at 327.48x the SP-only rate (809 vs 20779 reach)

    Tracked: on the task board at https://app.clickup.com/t/86eyyj06m · finding amc-sb-overlap-BPS.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

Booked, queued or already started

  • booked to run on 4 Nov 2026 - Claude Inventory Ledger EOM. Booked is not done.
  • booked to run on 1 Nov 2026 - Claude Market Watch Daily. Booked is not done.
  • booked to run on 15 Jan 2027 - Claude Horizon Review Quarterly. Booked is not done.
  • in the queue - MODE 6 engine, source report Inventory Planning (C4): Next month's FBA storage is estimated at $382.29 against $13287 of monthly contribution margin -> $382/mo at stake (MEASURED). Action: Review the
  • in the queue - BPS new-to-brand orders 27.49/mo vs goal 40.0/mo (pace 0.687, at-risk); shortfall 12.5 NTB orders/mo; operator-approved panel NTB goal 40/mo (90-day AMC baseline 29.7/mo); AMC window 2026-09-21..2026-
  • in the queue - [CLICK] "greens powder" wk ending 2026-10-10: impr share 0.2% -> click share 0.0% -> cart 0.1% -> purchase share 0.2% (market 649 purchases/wk, ours 1; 2 ASIN(s) pulled). Failing 1 of the last 1 weeks
  • in the queue - B0FST44W79 NanoCreatine 60 Servings: Margin -14.57/unit at 0.26 units/day (7.8/mo). Promo -43.50 is almost the full 44.95 dollar list price, essentially giving the unit away via coupon or promo depth,
  • in the queue - MODE 6 engine, source report BusinessReport: B073XX16D8 Unit Session % = 8.87% -> $2,135/mo at stake (CONFIRMED). Action: Find out why B073XX16D8 converts at 8.9% vs the catalog's 46.9%: check it is b
  • in the queue - MODE 6 engine, source report BusinessReport: B004DI1YW8 Unit Session % = 9.30% -> $840/mo at stake (CONFIRMED). Action: Find out why B004DI1YW8 converts at 9.3% vs the catalog's 52.4%: check it is buy

What we run for them

What we do for themStateLast doneHow often
listing copynothing on file shows we have ever done itneverno schedule set
visualsnothing on file shows we have ever done itneverno schedule set
catalog + economics solveup to date31 Oct 2026, todayevery 10 days
mode6knothing on file shows we have ever done itneverno schedule set
flat-file / bulk upload buildnothing on file shows we have ever done itneverevery 90 days
compliance / claims sweepup to date10 Oct 2026, 20 days agoevery 35 days
PPC engine run + auditup to date29 Oct 2026, 2 days agoevery 10 days
account-health daily sweepup to date28 Oct 2026, 3 days agoevery 3 days
replenishment plannothing on file shows we have ever done itneverno schedule set
monthly reportup to date12 Oct 2026, 19 days agoevery 35 days

Goals

Sales goal

PeriodTargetSo farHow we are doingWho is working on itOpen item
This month 2026-10 $38,000 $30,665 as of Oct 25 Ahead (107% of pace) - goal-bps-2026-10-ntb
This quarter 2026-Q4 $120,000 $30,665 as of Oct 25 On pace (101% of pace) - none open
This year 2026 $451,349 $362,259 as of Oct 25 On pace (99% of pace) - goal-bps-2026-10-ntb

Next year (2027): $577,000 - proposed, not graded.

Last change made for this goal: 5 days ago.

The numbers

$10,015Kept after everythinggoal $20,000 a month
$9,985Short of the goalthis is what the work below is for
$35,599Soldin the last 30 days
2.4%Ad cost per sales dollarbreak-even is 33.5%, worked out from August
$4,060Open work wortha month, if we work it
What we measureWhere it is nowWhere it needs to beWhat that means
Sales$35,599in the last 30 dayseverything customers paid, before any costs come out
People who looked1,646no target sethow many visits the products got
How many of them bought33.5%no target setabout 1 in 3 of the people who look at it buys
Average order$64no target setwhat a customer spends when they do buy
Units sold552no target sethow many items went out of the door
Ad spend$861room for $11,047 morewhat we paid Amazon to put the products in front of people
Ad cost per sales dollar2.4%must stay under 33.5%under the line where ads stop paying for themselves. That line was worked out from August, and nothing re-checks it at the moment we change something
Kept per sales dollar30.6%no target setwhat is left of each dollar after Amazon, the product itself and the ads
Kept in total$10,015goal $20,000 a monththe number every piece of work below is trying to move

Measured as at 29 Oct 2026 (yesterday). How the goal was set: OPERATOR-SET 2026-09-22 (chat instruction, ClickUp 86eyqb67b), supersedes the prior DERIVED-from-best-posted-month target which the ticket flagged as backward-looking ('a target denominated in the account's own recent best month structurally encodes zero growth'): $50,000 revenue and $20,000 profit. The operator gave no cadence word, but every other figure in this contract (cm_dollars_monthly, tacos_ceiling, the milestone ladder) is a MONTHLY figure and the instruction was raised against a ticket about a MONTHLY cm_dollars_monthly target — read as $50,000 revenue/mo and $20,000 profit/mo. Flagged on the ticket for the operator to confirm or correct the cadence.

This board shows whether the numbers moved. It does not say we moved them - what our own work is measured to have earned is the separate figure further down.

The goal we are working to

Right now: push for growth - it earns more than it spends, so buy more of it - the account is growing.

Keep $20,000 a month, with ads staying under 33.5% of sales.

  1. M0 true landed break-evendefinitional — CM$ >= 0 post-ads already reached
  2. M1 return to best-posted CM$ $13,905.01highest net across the months on disk (August, July): July posted +13,905.01 — a level this account has ACTUALLY achieved, not an assumed lift already reached
  3. M2 operator-set growth target $20,000 CM$ / $50,000 revenueOPERATOR-SET 2026-09-22 (chat instruction, ClickUp 86eyqb67b): $50,000 revenue and $20,000 profit. The operator gave no cadence word, but every other figure in this contract (cm_dollars_monthly, tacos_ceiling, the milestone ladder) is a MONTHLY figure and the instruction was raised against this ticket, which is itself about a MONTHLY cm_dollars_monthly target — read as $50,000 revenue/mo and $20,000 profit/mo. Flagged on the ticket for the operator to confirm or correct the cadence. this is the one we are working to

OPERATOR-SET 2026-09-22: active milestone moved to M2 ($20,000 CM$/mo, $50,000 revenue/mo), superseding the M1 best-posted-month recovery rung (M1 stays on the ladder as history, value 13,905.01).

What we have produced lately

  • 28 Oct 20262026-10-28__BPS_Find_out_why_B078X2FWZJ_converts_at_7_4_vs_the_catalog_.pdf
  • 28 Oct 20262026-10-28__BPS_Find_out_why_B078X2FWZJ_converts_at_7_4_vs_the_catalog_.html
  • 6 Oct 2026BPS_InventoryLedger_SummaryDaily_2026-09-01_to_2026-10-03.csv
  • 6 Oct 2026BPS_InventoryLedger_SummaryMonthly_2026-09.csv

4 things produced for them in the last 30 days.

Did it work

Nothing of theirs has been scored yet. The first change counted in money finishes its waiting period on Nov 3: a tune-up of the ads, made Oct 20 (nobody has sized this yet).

1 change is inside the waiting period and will be scored when it ends. 21 went out without anyone writing down the before-figure, so they can never be scored - not late, unmeasurable.

What needs you — 15

  1. $2,135 a month raised 31 days ago

    YOU — this goes to someone outside the agency, and it cannot be taken back

    Find out why B073XX16D8 converts at 8.9% vs the catalog's 46.9%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the listing is the cause, prepare a MODE4/MODE5 draft for approval (no live edit); otherwise drop the finding with the evidence.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is worth $2,135 a month.

    the evidence behind it
    MODE 6 engine, source report BusinessReport: B073XX16D8 Unit Session % = 8.87% -> $2,135/mo at stake (CONFIRMED). Action: Find out why B073XX16D8 converts at 8.9% vs the catalog's 46.9%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the 

    Tracked: on the task board at https://app.clickup.com/t/86eywphxt · finding mode6-bps-conversion-b073xx16d8.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  2. $840 a month raised 24 days ago

    YOU — this goes to someone outside the agency, and it cannot be taken back

    Find out why B004DI1YW8 converts at 9.3% vs the catalog's 52.4%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the listing is the cause, prepare a MODE4/MODE5 draft for approval (no live edit); otherwise drop the finding with the evidence.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is worth $840 a month.

    the evidence behind it
    MODE 6 engine, source report BusinessReport: B004DI1YW8 Unit Session % = 9.30% -> $840/mo at stake (CONFIRMED). Action: Find out why B004DI1YW8 converts at 9.3% vs the catalog's 52.4%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the li

    Tracked: on the task board at https://app.clickup.com/t/86eywphy8 · finding mode6-bps-conversion-b004di1yw8.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  3. $114 a month raised 41 days ago

    YOU — the selling price is one of the four things I never change without you

    Have the client review and pull back the active promo or coupon depth on this SKU; estimated 114 dollars per month bleed at current promo terms and velocity.

    This product is selling for less than it should be, given what it now costs to make and what Amazon takes. Every sale earns less than it used to. This one is worth $114 a month.

    the evidence behind it
    B0FST44W79 NanoCreatine 60 Servings: Margin -14.57/unit at 0.26 units/day (7.8/mo). Promo -43.50 is almost the full 44.95 dollar list price, essentially giving the unit away via coupon or promo depth, versus AdSpend -0.63 and normal CoG and fees.

    Tracked: NOT on the task board — nothing is chasing it but this row · finding bps-b0fst44w79-promo-bleed.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b0fst44w79-promo-bleed --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b0fst44w79-promo-bleed --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b0fst44w79-promo-bleed --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

the other 12 waiting on you, in the same order
  1. not sized raised today

    YOU — the selling price is one of the four things I never change without you

    re-check this ASIN on tomorrow's mode-7-comp run and route it to the monthly strategy review once the window's close date is known. Signals 2026-10-31: competitor B0C4HV7CHT (Bloom Nutrition) raised price to $29.97 (live SP-API matches; 30.4% above previous live read 2026-10-20 (read 2026-10-31); opened 2026-10-22) vs…

    There is a dated opportunity on this account - a deal, a promotion or a shopping event - and the window to use it closes. Missing it is not a mistake we can fix afterwards. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    Action: re-check this ASIN on tomorrow's mode-7-comp run and route it to the monthly strategy review once the window's close date is known. Signals 2026-10-31: competitor B0C4HV7CHT (Bloom Nutrition) raised price to $29.97 (live SP-API matches; 30.4% above previous live read 2026-10-20 (read 2026-10

    Tracked: on the task board at https://app.clickup.com/t/z8y71x1tjx · finding mktwatch-BPS-B0BSNW9LGJ-comp-pricerise.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  2. 7.8 percentage points of conversion raised 11 days ago

    YOU — the answer is a number or a fact that only you have

    size the BPS Aug->Sep unit-session drop by ASIN from the Business Report and confirm the M2 cadence with the operator (ClickUp 86eyqb67b).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is sized at 7.8 percentage points of conversion — that is not dollars.

    the evidence behind it
    CVR fell 45.1% (615 units / 1,364 sessions, Aug) -> 37.3% (552 / 1,479, Sep) = 7.8 pts (BPS_verified.json + sessions in the lever). Recovering to Aug CVR on Sep sessions = about 115 extra units/mo at Sep net/unit 18.14 = about 2,080/mo contribution (not forecast-validated). Per-ASIN split needs the 

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0zeq · finding horizon-BPS-2026-q3.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  3. not sized raised 7 days ago

    YOU — Approve a NanoGreens 15% coupon Nov 1-18 (ends before the Nov 19-30 20pct BFCM price discount) or a different window

    I need you to give me Approve a NanoGreens 15% coupon Nov 1-18 (ends before the Nov 19-30 20pct BFCM price discount) or a different window. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on Approve a NanoGreens 15% coupon Nov 1-18 (ends before the Nov 19-30 20pct BFCM price discount) or a different window — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BPS 15% coupons on NanoGreens Super Greens (2 ASINs) end Oct 31: 3,519 dollars sales, 64 redemptions, 6% of 10k budget used; NanoGreens+Probiotic 319; NanoPro 20% 616. Not auto-relaunched: a Nov 1-30 relaunch would stack with the Nov 19-30 20pct PBDD and margin gate was not verified at today's COGS.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x30xn · finding amazon-promotions-bps-nanogreens-coupon-relaunch.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  4. not sized raised 18 days ago

    YOU — the selling price is one of the four things I never change without you

    Open the BPS BFCM promo on Promotion Central, read the 1 issue, fix before 2026-11-19.

    There is a dated opportunity on this account - a deal, a promotion or a shopping event - and the window to use it closes. Missing it is not a mistake we can fix afterwards. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BPS BFCM Prime 20pct top sellers (7 ASINs) shows 1 issue.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0f7g · finding amazon-promotions-bps-bfcm-price-discount-issue.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  5. not sized raised 4 days ago

    YOU — the unit cost (ex-shipping) for BPS B0FST44W79

    I need you to give me the unit cost (ex-shipping) for BPS B0FST44W79. I cannot get this anywhere else — re-running /goal-cascade BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /goal-cascade BPS and work it to a decision.

    This one is stuck waiting on the unit cost (ex-shipping) for BPS B0FST44W79 — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BPS readiness cogs: 1 selling ASIN(s) with a $0 cost: B0FST44W79 - profit is UNSIZED for these (newest cost source 65 day(s) old (STALE, over 21 days)) (source: Sync/cogs/BPS.json; projects/mode6-catalog-gap-audit/inputs_BPS/BPS_Sellerboard_economics.json; projects/mode6-catalog-gap-audit/inputs_BPS

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5x · finding goal-bps-readiness-cogs.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  6. not sized raised 25 days ago

    YOU — Approve relaunching the two 10pct BTP retention promos (Repeat + Promising) after live re-read and margin gate

    I need you to give me Approve relaunching the two 10pct BTP retention promos (Repeat + Promising) after live re-read and margin gate. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on Approve relaunching the two 10pct BTP retention promos (Repeat + Promising) after live re-read and margin gate — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BTP Customer Retention (Repeat, 3 redemptions, 205 USD sales) and Retention - Promising (7 redemptions, 435 USD sales), 10pct, ran 2026-09-06 to 2026-10-05, no successor scheduled; from 2026-10-05 read (profile locked 10-06, not live-verified); no natural closing date, open-ended. Action: Re-read BP

    Tracked: on the task board at https://app.clickup.com/t/z8y71wzfr1 · finding amazon-promotions-bps-btp-repeat-promising-relaunch.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  7. not sized raised 32 days ago

    YOU — 3 BPS BTPs ending within 7d show weak performance — confirm retire vs relaunch-at-shallower-terms

    I need you to give me 3 BPS BTPs ending within 7d show weak performance — confirm retire vs relaunch-at-shallower-terms. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on 3 BPS BTPs ending within 7d show weak performance — confirm retire vs relaunch-at-shallower-terms — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    3 Brand Tailored Promotions on BPS end within the next 7 days with weak redemption/performance figures on the surface. Action: operator call on retire vs relaunch given weak numbers (outside AUTO-RELAUNCH bounds since original did not clearly perform).

    Tracked: on the task board at https://app.clickup.com/t/z8y71wy3n3 · finding bps-btp-3-ending-weak-2026-09-29.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  8. not sized raised 32 days ago

    YOU — BPS NanoPro Immune coupon ends Oct1 with weak performance, no scheduled replacement — confirm retire vs relaunch

    I need you to give me BPS NanoPro Immune coupon ends Oct1 with weak performance, no scheduled replacement — confirm retire vs relaunch. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on BPS NanoPro Immune coupon ends Oct1 with weak performance, no scheduled replacement — confirm retire vs relaunch — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    NanoPro Immune coupon on BPS ends 2026-10-01; performance on the surface reads weak (low redemption); no replacement staged. Outside AUTO-RELAUNCH bounds (did not clearly perform). Action: operator decision needed before Oct1.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wy3n4 · finding bps-coupon-nanopro-ending-2026-09-29.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  9. not sized raised today

    YOU — this goes to someone outside the agency, and it cannot be taken back

    Keep case 22239398331 open and follow up on it in Seller Central if Amazon has not replied within its promised window.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    [KPI M2 operator-set growth target $20,000 CM$ / $50,000 revenue | cm_dollars_monthly>=20000 | posture scale-up] Seller Central case 22239398331 checkback 2026-10-31T14:27:30.243Z: verdict WAITING, case status "Answered"; listing check: STILL OPEN: B073XX16D8 product group still reads "Pet Products"

    Tracked: on the task board at https://app.clickup.com/t/z8y71x15ej · finding case-BPS-22239398331.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  10. not sized raised 4 days ago

    YOU — this goes to someone outside the agency, and it cannot be taken back

    prepare a mode4 title + description DRAFT for BPS for operator approval; no live edit, no price change.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BPS readiness copy: coverage audit: title P, description Y (source: readiness_map.json coverage_audit (an audit read, not a live measurement))

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5z · finding goal-bps-readiness-copy.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  11. not sized raised 4 days ago

    YOU — this goes to someone outside the agency, and it cannot be taken back

    hand BPS's content package to the operator as a mode4 draft (draft-only client).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    BPS readiness listing: prepared, not applied: a content package exists but no receipt shows it live (source: C:\Users\miraf\.claude\skills\mode6k\goal_history\readiness\content\BPS.json)

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5y · finding goal-bps-readiness-listing.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  12. not sized raised 4 days ago

    YOU — this goes to someone outside the agency, and it cannot be taken back

    hand BPS's content package to the operator as a mode4 draft (draft-only client).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    the evidence behind it
    [KPI M2 operator-set growth target $20,000 CM$ / $50,000 revenue | cm_dollars_monthly>=20000 | posture scale-up] readiness gap "listing": prepared, not applied: a content package exists but no receipt shows it live (goal_history/readiness/BPS.json)

    Tracked: on the task board at https://app.clickup.com/t/z8y71x18dh · finding mode4-bps-listing-readiness.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

Their task board — 22 of them past due

Ranked by what each one is worth to the account per month, highest first. 4 of the 44 carry a dollar figure, $3,946 a month between them. 22 are tickets with no finding behind them at all, so they appear on no other tab on this page.

  1. $2,135 a month

    Find out why B073XX16D8 converts at 8.9% vs the catalog's 46.9%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the listing is the cause, prepare a MODE4/MODE5 draft for approval (no live edit); otherwise drop the finding with the evidence.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is worth $2,135 a month.

    Tracked: on the task board at https://app.clickup.com/t/86eywphxt · finding mode6-bps-conversion-b073xx16d8.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b073xx16d8 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  2. $840 a month

    Find out why B004DI1YW8 converts at 9.3% vs the catalog's 52.4%: check it is buyable and in stock, its images, rating and reviews, and its price against sibling products. If the listing is the cause, prepare a MODE4/MODE5 draft for approval (no live edit); otherwise drop the finding with the evidence.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is worth $840 a month.

    Tracked: on the task board at https://app.clickup.com/t/86eywphy8 · finding mode6-bps-conversion-b004di1yw8.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-conversion-b004di1yw8 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  3. $589 a month

    Open the FBA reimbursement case in Seller Central for BPS NanoGreens10-stickerless (B003YSVBEO): 4 lost units plus 17 unknown-event units, and 1 lost on B00NLQS7E6, before the claim window closes.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. This one is worth $589 a month.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x08qf · finding ledgereom-BPS-2026-09-unreconciled-units.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id ledgereom-BPS-2026-09-unreconciled-units --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  4. $382 a month

    Review the storage footprint of the slowest-turning SKUs -- storage is running above 2%% of the catalog's monthly margin.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. This one is worth $382 a month.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0qy9 · finding mode6-bps-fba-fee-dimensional-account-of-margin.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode6-bps-fba-fee-dimensional-account-of-margin --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  5. 25 visits a month

    mode5: test the main image against the top-3 on this query; price is the operator's call and is handed over, never changed.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. This one is sized at 25 visits a month — that is not dollars.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x129d · finding sqp-funnel-bps-greens-powder-click.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id sqp-funnel-bps-greens-powder-click --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  6. 7.8 percentage points of conversion

    size the BPS Aug->Sep unit-session drop by ASIN from the Business Report and confirm the M2 cadence with the operator (ClickUp 86eyqb67b).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. This one is sized at 7.8 percentage points of conversion — that is not dollars.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0zeq · finding horizon-BPS-2026-q3.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id horizon-BPS-2026-q3 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  7. 28 visits a month

    owner: mode7-run - in the next MODE 7 run for BPS, grow new-to-brand orders: lean budget into the top NTB campaigns (BD | ALL | SPA-KTA | EX (25 NTB/90d); ALL | SPA-KTA | Branded | Dyn Down Only (22 NTB/90d); GRN | SPA-PTA | Target Competitor | Higher Price | TOS 100 (19 NTB/90d)); retarget the clicked-not-bought pool (112 shoppers); pair Sponsored Products with Sponsored Brands where they overlap (SP+SB converts 1.28x SP alone). Keep NTB cost under the $26.79 NTB CAC ceiling. No price change.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. This one is sized at 28 visits a month — that is not dollars.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wz8u4 · finding goal-bps-2026-10-ntb.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-2026-10-ntb --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  8. not sized

    re-check this ASIN on tomorrow's mode-7-comp run and route it to the monthly strategy review once the window's close date is known. Signals 2026-10-31: competitor B0C4HV7CHT (Bloom Nutrition) raised price to $29.97 (live SP-API matches; 30.4% above previous live read 2026-10-20 (read 2026-10-31); opened 2026-10-22) vs…

    There is a dated opportunity on this account - a deal, a promotion or a shopping event - and the window to use it closes. Missing it is not a mistake we can fix afterwards. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x1tjx · finding mktwatch-BPS-B0BSNW9LGJ-comp-pricerise.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mktwatch-BPS-B0BSNW9LGJ-comp-pricerise --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  9. not sized

    upload BPS_rufus_TREATMENT_upload_2026-09-01.xlsm in Seller Central, then run /mode4 on BPS_rufus_mode4_workorder_2026-09-01.csv.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/86eytr40g · finding rufus-attribute-sweep-BPS-attr-completeness.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id rufus-attribute-sweep-BPS-attr-completeness --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  10. not sized

    Recheck published hotspot accessible text after propagation; assess a module replacement only if accessibility remains broken.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/86eyvtcve · finding bps-nanocreatine-aplus-hotspot-alt-rendering.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-nanocreatine-aplus-hotspot-alt-rendering --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  11. not sized

    enrol B083VVZS44 in Amazon Vine from the Seller Central Vine dashboard, which opens on Get started with Amazon Vine and is not gated on this account.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/86eywr465 · finding bps-b083vvzs44-vine-never-enrolled-2026-09.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-b083vvzs44-vine-never-enrolled-2026-09 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  12. not sized

    Size a Sponsored Brands budget increase for BPS on the campaigns that share SP shoppers through mode7-strategy and hand it over for spend sign-off.

    Customers are searching for what this product is, and it is not showing up. The demand is there and it is going to someone else. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/86eyyj06m · finding amc-sb-overlap-BPS.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amc-sb-overlap-BPS --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  13. not sized

    I need you to give me 3 BPS BTPs ending within 7d show weak performance — confirm retire vs relaunch-at-shallower-terms. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on 3 BPS BTPs ending within 7d show weak performance — confirm retire vs relaunch-at-shallower-terms — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wy3n3 · finding bps-btp-3-ending-weak-2026-09-29.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-btp-3-ending-weak-2026-09-29 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  14. not sized

    I need you to give me BPS NanoPro Immune coupon ends Oct1 with weak performance, no scheduled replacement — confirm retire vs relaunch. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on BPS NanoPro Immune coupon ends Oct1 with weak performance, no scheduled replacement — confirm retire vs relaunch — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wy3n4 · finding bps-coupon-nanopro-ending-2026-09-29.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id bps-coupon-nanopro-ending-2026-09-29 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  15. not sized

    I need you to give me Approve relaunching the two 10pct BTP retention promos (Repeat + Promising) after live re-read and margin gate. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on Approve relaunching the two 10pct BTP retention promos (Repeat + Promising) after live re-read and margin gate — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wzfr1 · finding amazon-promotions-bps-btp-repeat-promising-relaunch.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-btp-repeat-promising-relaunch --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  16. not sized

    Open the BPS BFCM promo on Promotion Central, read the 1 issue, fix before 2026-11-19.

    There is a dated opportunity on this account - a deal, a promotion or a shopping event - and the window to use it closes. Missing it is not a mistake we can fix afterwards. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0f7g · finding amazon-promotions-bps-bfcm-price-discount-issue.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-bfcm-price-discount-issue --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  17. not sized

    I need you to give me Approve a NanoGreens 15% coupon Nov 1-18 (ends before the Nov 19-30 20pct BFCM price discount) or a different window. I cannot get this anywhere else — re-running /amazon-promotions BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /amazon-promotions BPS and work it to a decision.

    This one is stuck waiting on Approve a NanoGreens 15% coupon Nov 1-18 (ends before the Nov 19-30 20pct BFCM price discount) or a different window — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x30xn · finding amazon-promotions-bps-nanogreens-coupon-relaunch.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id amazon-promotions-bps-nanogreens-coupon-relaunch --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  18. not sized

    I need you to give me the unit cost (ex-shipping) for BPS B0FST44W79. I cannot get this anywhere else — re-running /goal-cascade BPS would only raise the same finding again, so nothing moves until you send it. Once you have, I run /goal-cascade BPS and work it to a decision.

    This one is stuck waiting on the unit cost (ex-shipping) for BPS B0FST44W79 — a number that exists only where you can get it, so no run of any job here will fill it in. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5x · finding goal-bps-readiness-cogs.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-cogs --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  19. not sized

    prepare a mode4 title + description DRAFT for BPS for operator approval; no live edit, no price change.

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5z · finding goal-bps-readiness-copy.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-copy --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  20. not sized

    hand BPS's content package to the operator as a mode4 draft (draft-only client).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71wyx5y · finding goal-bps-readiness-listing.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id goal-bps-readiness-listing --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  21. not sized

    hand BPS's content package to the operator as a mode4 draft (draft-only client).

    People are finding this product but not buying it. The traffic is already paid for, so every visitor who leaves without buying is money spent for nothing. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x18dh · finding mode4-bps-listing-readiness.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id mode4-bps-listing-readiness --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  22. not sized

    Keep case 22239398331 open and follow up on it in Seller Central if Amazon has not replied within its promised window.

    There is money already sitting in this account that nobody has collected. It is not new sales; it is money that is already ours. It is usually spend that produced nothing, a fee charged wrongly, or stock Amazon owes for. Nobody has put a size on this one yet, so measuring it is the first step.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x15ej · finding case-BPS-22239398331.

    When it is done, run this: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status MEASURED If we decide not to do it, run this instead: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status DROPPED The moment the change actually goes live, run this first: node ~/.claude/skills/ops/levers.mjs resolve --client BPS --id case-BPS-22239398331 --status FIRED FIRED and MEASURED are two different points in the job, not two names for the same one.

  23. nobody has sized this yet 60 days past due

    BPS — resolve NanoGreens parent/flavor/category and NanoBeauty flavor holds TO DO · SOP & Prompts/CLAUDE OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyr0q1b · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  24. nobody has sized this yet 60 days past due

    BPS — obtain product-specific allergen statements for 7 held listings TO DO · SOP & Prompts/CLAUDE OPS

    Run the check the ticket itself carries, and close it if it passes: node C:\Users\miraf\mode4-output\BPS_2026-08-24\build\allergen_check.mjs

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyr09ba · no finding id is attached to it.

    When it is done: the check above is what closes it.

  25. nobody has sized this yet 56 days past due

    CASE REGISTER - 21701526061 (Exec Escalation on 21665412811) - BPS bank verification stalled, reply drafted not sent TO DO · SOP & Prompts/CLAUDE OPS

    Run the check the ticket itself carries, and close it if it passes: node C:/Users/Brian/mode7-analysis/_closecheck_case_21701526061.mjs

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyun4z3 · no finding id is attached to it.

    When it is done: the check above is what closes it.

  26. nobody has sized this yet 54 days past due

    BPS + CHI: 121 product ads refused NOT_BUYABLE — 1 dead SKU to drop from the plan, 3 SKUs out of stock TO DO · SOP & Prompts/CLAUDE OPS

    Run the check the ticket itself carries, and close it if it passes: node C:/Users/miraf/projects/ppc-engine/scripts/check-not-buyable-ad-skus.mjs

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyqnn1n · no finding id is attached to it.

    When it is done: the check above is what closes it.

  27. nobody has sized this yet 54 days past due

    BPS NanoCreatine - get COA + cGMP certificate (unblocks every premium claim) TO DO · BioPharma Scientific/OPS

    Run the check the ticket itself carries, and close it if it passes: node ~/.claude/skills/ops/checks/bps_B0FST44W79.mjs coa-cgmp

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyqn8re · no finding id is attached to it.

    When it is done: the check above is what closes it.

  28. nobody has sized this yet 53 days past due

    BPS - NanoGreens B003YSVBEO: one SKU lists 5 uses, the other says 'fruit and vegetable' TO DO · SOP & Prompts/CLAUDE OPS

    Run the check the ticket itself carries, and close it if it passes: node C:/Users/miraf/mode4-output/BPS_2026-08-24/build/check_uses_harmonised.mjs

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyr0w45 · no finding id is attached to it.

    When it is done: the check above is what closes it.

  29. nobody has sized this yet 38 days past due

    Overdue brief 09-19: 10 blockers still open after the bookkeeping fix (BPS NTB lane + CHP/FCS/MR/PHY inputs) TO DO · SOP & Prompts/CLAUDE OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyx8krh · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  30. nobody has sized this yet 35 days past due

    [BPS] Restock or retire SKU 4X-N7R3-HVX9 — 3 Subscribe & Save subscriptions frozen since Aug 02 CLIENT PENDING · SOP & Prompts/CLAUDE OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyp0ekm · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  31. nobody has sized this yet 32 days past due

    BPS 3.17-8: 11 offers identified by ASIN instead of a brand-owned barcode TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyur77a · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  32. nobody has sized this yet 28 days past due

    BPS PPC - RC-2 run the two-week hold-out that decides whether halo overturns the -1480 non-branded verdict TO DO · BioPharma Scientific/PPC

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyukqe7 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  33. nobody has sized this yet 17 days past due

    Replies owed: BPS Bruna (flavor+who ships), PIO Henry (acct health), HGS Zoom times TO DO · SOP & Prompts/CLAUDE OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0k25 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  34. nobody has sized this yet 17 days past due

    BPS: Dietary Supplements high-performing listing removed - PAST DUE priority action ($59,223 at-risk sales) TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x0g07 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  35. nobody has sized this yet 17 days past due

    [BPS] posture accept/reject — derived efficiency vs held scale-up TO DO · SOP & Prompts/CLAUDE OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyxwmya · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  36. nobody has sized this yet 17 days past due

    BPS Ranking Gap: winnable mid-tail backend+SP build (289 unranked terms, $6,223/mo ceiling) PENDING-CHECK BACK · BioPharma Scientific/OPS

    Run the check the ticket itself carries, and close it if it passes: no local scriptable check

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyuycug · no finding id is attached to it.

    When it is done: the check above is what closes it.

  37. nobody has sized this yet 16 days past due

    BPS international expansion - client decisions + certificate gate (report 2026-09-23) TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyy6v0r · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  38. nobody has sized this yet 13 days past due

    BPS Ranking Gap: 'greens powder' #106 -> page 1 PENDING-CHECK BACK · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyuycuh · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  39. nobody has sized this yet 9 days past due

    BPS OPS - RC-5 raise the repeat rate: retention is the only lever that moves the CAC ceiling itself TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyukr23 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  40. nobody has sized this yet 8 days past due

    BPS: NanoMeal shipment FBA19QXL5TS9 is 4 units short (8 of 12 received) TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x02aj · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  41. nobody has sized this yet 5 days past due

    AUTO-REMEDIATE could not fix: Claude-BPS-NanoGlucoRecheck-20261002 (ARTIFACT-UNATTRIBUTED) TO DO · SOP & Prompts/CLAUDE OPS

    Run the check the ticket itself carries, and close it if it passes: node ~/.claude/skills/ops/assert_finding_clear.mjs --task "Claude-BPS-NanoGlucoRecheck-20261002" --code "ARTIFACT-UNATTRIBUTED"

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x31fb · no finding id is attached to it.

    When it is done: the check above is what closes it.

  42. nobody has sized this yet 5 days past due

    BPS - widen the ASIN-targeting target set and raise its bids (the only lane acquiring strangers) PENDING-CHECK BACK · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eyrxnv2 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  43. nobody has sized this yet 4 days past due

    MODE10: BPS listings scheduled for removal 2026-10-28 (notice Oct 15/16) TO DO · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/z8y71x140g · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

  44. nobody has sized this yet 3 days past due

    MODE10: BPS 2 open Food/Product Safety Issues CLIENT PENDING · BioPharma Scientific/OPS

    This ticket records no action to take. Open it and write one, or close it — as it stands nothing on any machine here can act on it.

    No finding is attached to this ticket, so there is no record of what it is worth or why it was raised. That is a gap in whatever filed it, not a decision waiting on you.

    Tracked: on the task board at https://app.clickup.com/t/86eytw9v5 · no finding id is attached to it.

    When it is done: this ticket never said what would count as finished, so no command closes it — which is exactly why it has stayed open.

Issues to check

Where this is tracked

37 tasks open on their board, 22 of them past due. The most valuable, worth first:

38 more are in the “On the board” tab above, in the same order.